Shipping Kit Inventory List
Note – When you receive your server, place it in the environment where you will
install it. Leave it in its shipping crate at its final destination for 24 hours. This resting
period prevents thermal shock and condensation.
Verify that you have received all of the components that ship with your server.
SPARC T3-2 server
■
2 AC power cords (if ordered)
■
RJ-45 to DB-9 crossover adapter for the SER MGT port
■
Antistatic wrist strap
■
Rackmount kit
■
Cable management arm (if ordered)
■
SPARC T3-2 Server Getting Started Guide with license and safety documents
■
Optional components (for example, PCIe cards) that are packaged separately from
■
the other items
Preparing for the Installation
11
Need help?
Do you have a question about the Sun SPARC T3-2 and is the answer not in the manual?
Questions and answers