Cabling Requirements

Prior to cabling and powering-on the server, gather the following network
information:
Netmask
IP address for the service processor
Gateway IP address
At a minimum, you must connect cables to these ports before powering-on the server
for the first time:
SP SER MGT port
SP NET MGT port
At least one system on-board Ethernet network port
Power cables to the power supply inlet ports
Related Information
"Connect the SER MGT Cable" on page 39
"Connect the NET MGT Cable" on page 40
"Connect the Ethernet Network Cables" on page 41
"Prepare the Power Cords" on page 46
"Power On the System for the First Time" on page 52