Power On The System For The First Time - Oracle Sun SPARC T3-2 Installation Manual

Table of Contents

Advertisement

3. Connect a terminal or a terminal emulator (PC or workstation) to the service
processor serial management port.
Configure the terminal or terminal emulator with these settings:
A null modem configuration is needed, meaning the transmit and receive signals
are reversed (crossed over) for DTE to DTE communications. You can use the
supplied RJ-45 crossover adapters with a standard RJ-45 cable to achieve the null
modem configuration.
Note – When you power on the server for the first time and you do not have a
terminal or terminal emulator (PC or workstation) connected to the SP SER MGT
port, you will not see system messages.
4. Continue with the installation by powering on the server for the first time.
See
Related Information
"Connect the SER MGT Cable" on page 39
"Power On the System for the First Time" on page 52
▼ Power On the System for the First
Time
1. Confirm that you have installed the server in a rack and attached all of the data
cables.
For instructions, see:
2. Confirm that you made a serial connection to the service processor.
For instructions, see
page
52
SPARC T3-2 Server Installation Guide • March 2012
9600 baud
8 bits
No parity
1 stop bit
No handshake
"Power On the System for the First Time" on page
"Installing the Server" on page 17
"Connecting the Server Cables" on page 35
"Connect a Terminal or Emulator to the SER MGT Port" on
51.
52.

Advertisement

Table of Contents
loading

Table of Contents