Stabilize The Rack For Installation; Disassemble Slide Rails; Rack Compatibility - Oracle Sun SPARC T3-2 Installation Manual

Table of Contents

Advertisement

▼ Stabilize the Rack for Installation

Caution – To reduce the risk of personal injury, stabilize the expansion rack cabinet
and extend all anti-tilt devices before installing the server.
Refer to your rack documentation for detailed instructions for the following steps.
1. Open and remove the front and rear doors from the rack cabinet.
2. To prevent the rack cabinet from tipping during the installation, stabilize the
cabinet using all anti-tilt mechanisms provided.
3. If there are leveling feet beneath the rack cabinet to prevent it from rolling,
extend these leveling feet fully downward to the floor.
4. Fully extend the rack cabinet's anti-tilt legs or anti-tilt bar, which are located at
the bottom front of the rack cabinet.
Related Information
The rack documentation
SPARC T3-2 Server Safety and Compliance Guide
"Rack Compatibility" on page 18

▼ Disassemble Slide Rails

Complete the following task to disassemble the slide rails before installation.
To remove the mounting brackets from the slide rail assemblies:
1. Unpack the slide rails.
2. Locate the slide rail lock at the front of one of the slide rail assemblies.
20
SPARC T3-2 Server Installation Guide • March 2012

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Sun SPARC T3-2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents