Tools Needed for Installation
To install the system, you must have the following tools:
No. 2 Phillips screwdriver
■
ESD mat and grounding strap
■
In addition, you must provide a system console device, such as one of the following:
ASCII terminal
■
Workstation
■
Terminal server
■
Patch panel connected to a terminal server
■
Related Information
"Optional Component Installation" on page 16
■
SPARC T3-2 Server Service Manual
■
Optional Component Installation
The standard components of the server are installed at the factory. However, if you
ordered options such as additional memory or PCIe cards, these options will be
shipped separately. If possible, install these components prior to installing the server
in a rack.
If you ordered any options that are not factory-installed, see the SPARC T3-2 Server
Service Manual and the component's documentation for installation instructions.
Note – The list of optional components can be updated without notice. Refer to the
product web pages for the most current list of components supported in the server.
Related Information
The optional component documentation
■
SPARC T3-2 Server Service Manual
■
16
SPARC T3-2 Server Installation Guide • March 2012
Need help?
Do you have a question about the Sun SPARC T3-2 and is the answer not in the manual?
Questions and answers