Waters TRIZAIC UPLC System Manual page 23

Table of Contents

Advertisement

4.
Connect the data/power cable to the QSPI connector on the rear of the
nanoACQUITY UPLC sample manager, and tighten the connector
screws firmly with a screwdriver.
Source connections to mass spectrometer:
Options
cable
High voltage
cable
Data/power
cable to QSPI
connector on
nanoACQUITY
sample manager
5.
Connect the high voltage cable (white) to the high voltage supply outlet
on the mass spectrometer.
6.
Connect the reference probe power cable (green) to the reference probe
power inlet on the mass spectrometer.
7.
Connect the options cable (blue) to the options port on the mass
spectrometer.
Installing the TRIZAIC UPLC source
Reference probe
power cable
2-7

Advertisement

Table of Contents
loading

Table of Contents