Mercury 200 OptiMax Jet Drive Service Manual page 131

Table of Contents

Advertisement

Charging and Starting System
7.
Tighten the M10 x 120 bolt and nut to the specified torque.
b
Description
Bolt (M10 x 100)
Bolt (M10 x 55) and nut
Bolt (M10 x 120) and nut
8.
Connect the excitation/sensing wire connector to the alternator.
9.
Connect the fusible link cable to the alternator output terminal. Secure the fusible link cable with a M6 nut. Tighten the nut to
the specified torque. Protect the alternator output terminal with the insulator boot.
a
b
Description
Nut (M6)
Page 2B-20
a
a -
Bolt (M10 x 100)
b -
Bolt (M10 x 55) and nut
c -
Bolt (M10 x 120) and nut
c
32059
a -
Fusible link cable
b -
Excitation/sensing wire connector
32049
Nm
lb‑in.
75
54
54
Nm
lb‑in.
7
62
90-8M0050731 MAY 2011
lb‑ft
55
40
40
lb‑ft

Advertisement

Table of Contents
loading

Table of Contents