3.
Install the oil line coming from the oil pump onto the fitting under the air compressor pulley and secure with a cable tie.
a
4.
Install the air compressor onto the studs.
5.
Install the two top screws (M10 x 25) finger‑tight and then tighten to the first specified torque.
IMPORTANT: Do not overtighten. This is the first of a two stage torque process.
Description
Screw (M10 x 25) (2)
6.
Install the water dump hose to the air compressor and secure with a cable tie.
7.
Install a washer and nut onto each stud and tighten the nut to the specified torque.
a
90-8M0050731 MAY 2011
b
c
First
Final
c
b
a -
Cable tie securing the oil line coming from #5 reed block
b -
Cable tie securing the oil line coming from the top main
bearing
c -
Cable tie securing the oil delivery line coming from the oil
pump
26404
a -
Screw (M10 x 25, flange) (2)
a
45928
e
d
45931
Direct Fuel Injection
Nm
lb‑in.
1.5
13
56
a -
Water hose to expansion chamber
b -
Nut and washer (M8)
c -
Air compressor oil inlet hose
d -
Oil hose to top main bearing
e -
Oil hose to #5 reed block
lb‑ft
41.3
Page 3B-79