jcb JS200 Service Manual page 429

Hide thumbs Also See for JS200:
Table of Contents

Advertisement

Section E
94 - 3
*
Reduction Gear
Dismantling (cont'd)
9
Support the flange part of gear case 58 on 300 mm
(11.8 in) blocks and press shaft end with a hydraulic
press to push out shaft 53, collar 54, plate 56, self-
aligning roller bearing 57, snap ring 60 and collar 59
from the assembly.
11
Remove and discard oil seal 61 from gear case 58 by
tapping.
9803/6400
Hydraulics
Slew Motor
10
Remove the roller bearing 62 from gear case 58.
12
Remove snap ring 60 from pinion shaft 53 and remove
collar 59.
Note: Before removing collar 59, make a note of which way
round it is, to ensure correct reassembly.
Section E
94 - 3
Issue 2*

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Js210Js220Js240Js260

Table of Contents