jcb JS200 Service Manual page 428

Hide thumbs Also See for JS200:
Table of Contents

Advertisement

Section E
94 - 2
*
Reduction Gear
Dismantling (cont'd)
5
Dismantling of 2nd stage holder assembly.
Drive spring pins 75 into shaft 70.
Note: The spring pins cannot be reused.
! WARNING
*
You can be injured by flying metal splinters when driving
metal pins in or out. Use a soft faced hammer or drift to
remove and fit metal pins. Always wear safety glasses.
INT-3-1-3
7
Ring gear removal
Remove ring gear 64 from gear case 58. JCB High
Strength Gasketing is applied on the assembly to
prevent oil leaks from between the ring gear and gear
case. To remove ring gear 64 use the notch on gear
case 58.
9803/6400
Hydraulics
Slew Motor
6
Support planetary gears 72 by hand and withdraw shaft
70 from holder 76.
8
Removal of pinion gear assembly.
Remove snap ring 55 with a screwdriver using the notch
in the case for leverage.
Section E
94 - 2
Issue 2*

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Js210Js220Js240Js260

Table of Contents