jcb JS200 Service Manual page 352

Hide thumbs Also See for JS200:
Table of Contents

Advertisement

Section E
74 - 4
Boom Ram (continued)
2.
Install the pin and then the bolt and nuts. When
*
checking or refitting JS machine pivot pins, the retaining
nuts and bolts should not be fastened up tight but must
have approximately 3mm of play so that the pin is free
from tension.
3.
Install the hoses to the boom ram.
4.
Lift the boom ram and align the rod eye end with boom
pin position.
5.
Install the pin with a bar and hammer.
9803/6400
Hydraulics
Hydraulic Rams
3mm
Section E
74 - 4
Issue 2*

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Js210Js220Js240Js260

Table of Contents