jcb JS200 Service Manual page 347

Hide thumbs Also See for JS200:
Table of Contents

Advertisement

Section E
73 - 4
Dipper Ram (continued)
2.
Install the pin, bolts and nuts. When checking or refitting
*
JS machine pivot pins, the retaining nuts and bolts
should not be fastened up tight but must have
approximately 3mm of play so that the pin is free from
tension.
3.
Install the grease tube to the Dipper ram.
4.
Connect the hoses to the Dipper ram.
5.
Hoist the Dipper ram to align the ram eye end with the
dipper pin position.
9803/6400
Hydraulics
Hydraulic Rams
Section E
73 - 4
3mm
Issue 2*

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Js210Js220Js240Js260

Table of Contents