Operation; Warm-Up Operation - Fuji Electric ZSVS-2 Instruction Manual

Compact type gas analyzer
Table of Contents

Advertisement

(1) Set power switch to ON. ("|": ON, " ": OFF). The
lamp within the power switch comes on.
(2) The WARM-UP display comes on and stays on
for about 2 seconds in the center. It then moves
to the lower left-hand corner of the screen. The
warm-up operation end time is displayed with
the down timer.
(3) The warm-up time is about 30 minutes after the power is
turned on.
On completion of the warm-up operation the WARM-UP
display and the timer go off.
Caution on operation
Press the
key during warm-up operation, and
measurement can be made. In this case, fluctuation of
the reading may result because the instrument has not
been warmed up fully.

3. OPERATION

3.1 Warm-up operation

After 2 seconds
- 18 -
Power supply switch "ON"
Caution on operation
Key operation cannot be made while the
WARM-UP display stays on in the center of the
screen.
Wait until the display moves to the lower left-
hand side corner of the screen.
INZ-TN2ZSVS-E

Advertisement

Table of Contents
loading

Table of Contents