Operation - Fuji Electric FCX-AII-V5 Series Instructions Manual And Service Instructions

Hide thumbs Also See for FCX-AII-V5 Series:
Table of Contents

Advertisement

3.2 Operation

(1) Operation of gauge (FKG) and absolute (FKA) pressure transmitter :
Open the valve slowly to apply a pressure.
When a pressure is applied, the transmitter is set in the operating
status.
(2) Operation of differential pressure transmitter (FKC):
Set the operating status by manipulating
the manifold valve.
Make sure the equalizing valve is open
Open the stop valve on the HP side slowly.
Close the equalizing valve.
Finally, open the stop valve on the LP side slowly
14
Stop valve on the
LP side
Open
Equalizing
valve
Close
Open
Open
Stop valve
on the HP
side
Open
INF-TN5FCXA2V5e-E

Advertisement

Table of Contents
loading

Table of Contents