Agilent Technologies 1290 Infinity II 2D-LC User Manual page 86

Solution for masshunter tof and q-tof
Hide thumbs Also See for 1290 Infinity II 2D-LC:
Table of Contents

Advertisement

4
Installation
Hardware Installation
3
Insert the pressure release assembly to the leak tray,
orientation as shown.
to waste
to T-piece (inline with the detector)
5
Connect with the T-piece, see
Install the Valve Head and Connecting Capillaries
For instructions on how to install the valve head and connecting capillaries, see
"Replace Valve Heads (G1170A)"
2D-LC User Guide
Figure 41
on page 85.
4
Push the pressure release assembly in the correct
position.
on page 327.
86

Advertisement

Table of Contents
loading

This manual is also suitable for:

1290 infinity ii lc

Table of Contents