Agilent Technologies 1290 Infinity II 2D-LC User Manual page 61

Solution for masshunter tof and q-tof
Hide thumbs Also See for 1290 Infinity II 2D-LC:
Table of Contents

Advertisement

4
Installation
Hardware Installation
Installation of the 2D-LC Valve and optional MHC decks
Attaching the external valve drives
For InfinityLab 2D-LC instruments that comprise at least one 1260 Infinity II or
1290 Infinity II pump, valve drives are attached to this pump with the Valve Clamp
Kit IF II (5067-5685), while the valve drives are interconnected by the Adapter
profile (5043-0269). The 2D-LC valve and if selected the MHC decks are mounted
on external valve drives (G1170A).
#
3
1
2
For a SHC configuration, the 2D-LC valve (G4236A) is attached to the upper
pump of the stack. In case of a MHC configuration, the upper MHC deck is
attached to the upper pump.
Figure 25
2D-LC User Guide
Holders / connectors
1290 Infinity Valve Drive (must be purchased
separately)
Clamp Guide Kit IF II (delivered with G1170A)
Adapter-profile (delivered with MHC Decks)
Schematic of the installation and attachments of the 2D-LC valve and optionally the
MHC decks.
Connection
P/N
Mooting of Valves
G1170A
Top valve to pump
5067-5685
between G1170A
5043-0269
drives
61

Advertisement

Table of Contents
loading

This manual is also suitable for:

1290 infinity ii lc

Table of Contents