Power On the Server (System Power Button)

Power On the Server (System Power Button)
Caution -
and the cover installed. Severe damage to server components can occur if the server is operated
without adequate cooling mechanisms.
1.
Verify that the power cords are connected and that standby power is on.
Shortly after power is applied to the server, the SP OK indicator blinks as the SP boots. The SP
OK indicator is illuminated solid green when the SP has successfully booted. After the SP has
booted, the Power OK/LED on the front panel begins flashing slowly, indicating that the host is
in standby power mode.
Press and release server power button on the server front panel.
2.
You might need to use a pointed object, such as a pen or pencil.
When main power is applied to the server, the main Power/OK LED begins to blink more
quickly while the server boots and lights solidly once the operating system boots.
Each time the server powers on, POST can take several minutes to complete tests.
Related Information
"Power On the Server (Oracle ILOM)" on page 159
"Clear a Fault Manually" on page 37
160
SPARC T8-1 Server Service Manual • January 2022
Do not operate the server without all fans, component heat sinks, air baffles, fillers,