Energy Drive Roller - GBC AdvancedPunch Technical & Service Manual

Table of Contents

Advertisement

4.7 Energy Drive Roller

Advanced Punch Service Manual
Maintenance Schedule
Clean every 750K cycles.
Procedure
Reference Figure 4.33 Energy Roller as you perform this procedure.
1. Without disconnecting either retaining spring (1), roll one of them gently to one
side to release the Energy Drive Roller shaft from its mounting bracket.
2. Lift the shaft (2) from the mounting bracket.
3. Using a clean cloth and alcohol, clean the surfaces of the rollers (3) to remove
any paper dust or toner that may have accumulated over time.
4. Reverse steps 2 & 1 above to replace the shaft into the holder.
5. Ensure the flats of the bearings are seated properly in the mounting brackets.
6. Ensure the springs are straight on the bearing to apply sufficient force for the
rollers to turn when you rotate the knob at the front of the machine.
See Figure 4.33a
© Copyright 2009 GBC. All rights reserved.
Repair and Adjustment Procedures
Figure 4.33 ENERGY ROLLER.
Figure 4.33a For LTR & A4
[1]
[2]
[3]
4-35

Advertisement

Table of Contents
loading

Table of Contents