Aligner Drive Belt (Green Belt) Replacement - GBC AdvancedPunch Technical & Service Manual

Table of Contents

Advertisement

Section 4

4.6.3 Aligner Drive Belt (Green Belt) Replacement

4-20
Maintenance Schedule
Clean every 750K cycles. Refer to
page 1-15.
Procedure
Before replacing the green drive belts, remove the Aligner panels. See
Removal"
on page 4-18. Then follow the procedures below for the entrance side or exit
side green drive belt service,
on page 4-21 or
"Paper Exit Side Green Drive Belt Replacement"
Tools Required
Phillips screw driver
Nut drivers, 1/4 and 5/16"
Hex wrenches, 5/64 and 9/64"
Snap ring pliers
E-Ring tool
Twelve inch metal ruler or similar straight edge
Caution: Disconnect the Advanced Punch from power and retain the power cord
in your possession for your safety. Failure to observe this caution can result in
injury.
Tip: Empty the paper chip bin and replace it. This makes it easier to find
small parts that you may drop into the bin.
© Copyright 2009 GBC. All rights reserved.
"Aligner Panel Inspection and Cleaning"
"Paper Entrance Side Green Drive Belt Replacement"
Advanced Punch Service Manual
on
"Aligner Panel
on page 4-27.

Advertisement

Table of Contents
loading

Table of Contents