Section 6.0 Level The Gantry; Time And Personnel; Tools And Test Equipment; Procedure - GE Optima CT680 Series Installation Manual

Table of Contents

Advertisement

GE C
OMPANY
D
5472001-1EN, R
IRECTION
EVISION

Section 6.0 Level the Gantry

6.1

Time and Personnel

Required Persons
2 (FE or mechanical supplier)
6.2

Tools and Test Equipment

Standard Install Tool Kit
Install Support Kit
GE Site Print
Gantry Adjuster Tool, P/N 2107863
Spanner Wrench, P/N 2110003
PPE
6.3

Procedure

The gantry uses 2 bubble levels that are permanently mounted to machined surfaces on the
stationary base to tell when it is level.
Figure 1-10 Gantry Bubble Level
Bubble levels are located on both ends of the gantry stationary base. They're located on the
stationary base near a point where the rotating structure pivots mount to the base structure. (See
Figure
page
45).
6
Bubble Level
1-10.) The gantry is properly leveled when the bubble is centered. (See
Chapter 1 - Position Subsystems
O
CT680 S
PTIMA
ERIES AND
Preliminary
Procedure
Reqs
O
CT670 I
M
PTIMA
NSTALLATION
Finalization
Figure 1-12, on
Page 43
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optima ct670Optima ct680 quantumOptima ct680 expertOptima ct680 professional

Table of Contents