GE C
OMPANY
D
5472001-1EN, R
IRECTION
EVISION
Section 6.0 Level the Gantry
6.1
Time and Personnel
Required Persons
2 (FE or mechanical supplier)
6.2
Tools and Test Equipment
•
Standard Install Tool Kit
•
Install Support Kit
•
GE Site Print
•
Gantry Adjuster Tool, P/N 2107863
•
Spanner Wrench, P/N 2110003
•
PPE
6.3
Procedure
The gantry uses 2 bubble levels that are permanently mounted to machined surfaces on the
stationary base to tell when it is level.
Figure 1-10 Gantry Bubble Level
Bubble levels are located on both ends of the gantry stationary base. They're located on the
stationary base near a point where the rotating structure pivots mount to the base structure. (See
Figure
page
45).
6
Bubble Level
1-10.) The gantry is properly leveled when the bubble is centered. (See
Chapter 1 - Position Subsystems
O
CT680 S
PTIMA
ERIES AND
Preliminary
Procedure
Reqs
O
CT670 I
M
PTIMA
NSTALLATION
Finalization
Figure 1-12, on
Page 43