Section 9.0 Table Installation (GT1700V)
Note:
For Lite Table Installation, refer to
9.1
Time and Personnel
Required Persons
2 (FE or mechanical supplier)
9.2
Tools and Test Equipment
•
•
•
•
•
•
•
9.3
Procedures
9.3.1
Draw Table Reference Lines
1.) Draw a reference line of 673 ± 6 mm (26.5" ± 0.25")position from Gantry Base on the floor as
Figure 1-25 Draw Reference Line
Page 54
6
Standard Install Tool Kit
3/4", 1-1/4", 1-1/2" and 1-5/8" sockets
8mm, 10mm, and 14mm hex socket bits
Laser Alignment kit
Johnson Professional 6" level
Johnson Professional 4' level
Johnson Professional 2' level
shown in the
Figure
1-25. This line should be parallel to the gantry. In a later section, you will
move the table against the 673 mm (26.5") mark.
Draw this line on the floor.
Section 9.0 - Table Installation (GT1700V)
O
CT680 S
PTIMA
ERIES AND
Section
10.0.
Preliminary Reqs
Procedure
1.5 hours labor on-site
673 ± 6 mm (26.5" ± 0.25")
O
CT670 I
PTIMA
NSTALLATION
Finalization
Gantry Base