GE Optima CT680 Series Installation Manual page 182

Table of Contents

Advertisement

GE C
OMPANY
D
5472001-1EN, R
IRECTION
EVISION
Figure A-25 Control Panel Service Position
Figure A-26 Gantry Service Mode Cable Terminator
Page 182
6
c.)
Align the ball studs with their associated receivers and snap into place.
d.) Connect FCVR BKHD J1 cable to terminator located on the cantrell arm. See
26.
e.) Connect the FRT CVR J3 cable to the extension cable 5369987 and connect the other
Section 1.0 - Gantry Cover Removal
O
CT680 S
O
PTIMA
ERIES AND
PTIMA
CT670 I
M
NSTALLATION
ANUAL
Figure A-

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optima ct670Optima ct680 quantumOptima ct680 expertOptima ct680 professional

Table of Contents