Position Subsystems; Section 1.0 Installer/Fe Notices; General Safety Guidelines; Shipping, Warehouse And Transportation Warning - GE Optima CT680 Series Installation Manual

Table of Contents

Advertisement

GE C
OMPANY
D
5472001-1EN, R
IRECTION
EVISION
Chapter 1

Position Subsystems

NOTICE
Record data collected from procedures in this chapter into Form 4879 when directed.
Only use the installation manual that arrives with your system. Any other revisions of
this manual may not exactly match your system.

Section 1.0 Installer/FE Notices

1.1

General Safety Guidelines

1.) Follow all safety precautions, warnings and instructions in this manual.
2.) Read and obey the warning and instructions on equipment labels or tags.
3.) Allow only qualified personnel to install, maintain and service this equipment.
4.) While the system is designed to meet all safety requirements applicable to medical equipment,
qualified operators must understand the potential safety hazards, and take steps to minimize
the risk at all times.
5.) Never modify the system in whole or part without prior written approval by GE Healthcare.
6.) Do not change, add or remove any system accessory without prior written approval of the
vendors local service manager.
7.) Never leave the system in an unsafe condition. Notify the customer that the system is not to
be used until a problem is resolved.
8.) Read and follow the precautions described in this manual.
1.2

Shipping, Warehouse and Transportation Warning

This gantry should be moved using the shipping dollies only. Do not lift or move it using a lift truck
under the gantry frame.
1.3

International Shipments

Use dollies to remove the gantry from the shipping skid and to transport the gantry to the
customer's site.
If lifting is required, instructions are in the Pre-Installation Manual for this system.
1.4

On Site Warning

This system requires a gantry bearing gap inspection before electrical calibration is started.
1.5

Service Actions

If the bearing inspection fails the FE opens a dispatch and does not continue with the electrical
calibration procedures.
6
Chapter 1 - Position Subsystems
O
CT680 S
O
PTIMA
ERIES AND
PTIMA
CT670 I
M
NSTALLATION
ANUAL
Page 25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optima ct670Optima ct680 quantumOptima ct680 expertOptima ct680 professional

Table of Contents