NOTICE
Positioning requires cutting eight (8) holes in the floor covering.
Before you drill or cut any flooring, make sure that you have discussed this issue with the
customer, and that the appropriate hospital personnel have approved the location of the
table/gantry.
Any repositioning must meet all regulatory requirements to be completed.
Check that the floor meets the levelness specification. Follow the escalation procedure if the
floor does not meet the floor specification.
If the floor is not level, the system does not meet the table ISO specification. The distance from
the table cradle to the floor cannot be greater than 1005 mm (40 in.).
8.) Check with the customer for approval of the gantry/table placement.
Template
center lines
Figure 1-4 Center Line with Marks
9.) Use a center punch to mark hole centers for each of the eight (8) leveling pad/anchor locations
per
method.
CAUTION
Potential for personal injury.
Use appropriate safety procedures when drilling the floor holes, especially if there is lead
under the floor.
Appropriate PPE is required when working with hazardous materials.
10.) Remove the floor template.
6
Tape with
mark
Figure
1-4. Before moving on to the next step, see
Chapter 1 - Position Subsystems
O
CT680 S
PTIMA
ERIES AND
GANTRY
Paper templates
TABLE
TABLE
Tape
with mark
Step
O
CT670 I
M
PTIMA
NSTALLATION
11and its note for an alternative
Page 37
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optima ct670Optima ct680 quantumOptima ct680 expertOptima ct680 professional

Table of Contents