GE Optima CT680 Series Installation Manual page 9

Table of Contents

Advertisement

GE C
OMPANY
D
5472001-1EN, R
IRECTION
EVISION
DAMAGE IN TRANSPORTATION
All packages should be closely examined at time of delivery. If damage is apparent, have notation
"Damage in Shipment" written on all copies of the freight or express bill before delivery is accepted
or "signed for" by a General Electric representative or a hospital receiving agent. Whether noted or
concealed, damage MUST be reported to the carrier immediately upon discovery, or in any event,
within 14 days after receipt, and the contents and containers held for inspection by the carrier. A
transportation company will not pay a claim for damage if an inspection is not requested within this
14-day period.
To file a report:
Call 1-800-548-3366 and use option 8.
Fill out a report on http://egems.med.ge.com/edq/home.jsp
Contact your local service coordinator for more information on this process.
Rev. June 13, 2006
CERTIFIED ELECTRICAL CONTRACTOR STATEMENT
All electrical Installations that are preliminary to positioning of the equipment at the site prepared
for the equipment shall be performed by licensed electrical contractors. In addition, electrical feeds
into the Power Distribution Unit shall be performed by licensed electrical contractors. Other
connections between pieces of electrical equipment, calibrations and testing shall be performed by
qualified GE Medical personnel. The products involved (and the accompanying electrical
installations) are highly sophisticated, and special engineering competence is required. In
performing all electrical work on these products, GE will use its own specially trained field
engineers. All of GE's electrical work on these products will comply with the requirements of the
applicable electrical codes.
The purchaser of GE equipment shall only utilize qualified personnel (i.e., GE's field engineers,
personnel of third-party service companies with equivalent training, or licensed electricians) to
perform electrical servicing on the equipment.
IMPORTANT...X-RAY PROTECTION
X-ray equipment, if not properly used, may cause injury. Accordingly, the instructions herein
contained should be thoroughly read and understood by everyone who will use the equipment
before you attempt to place this equipment in operation. The General Electric Company, GE
Healthcare Group, will be glad to assist and cooperate in placing this equipment in use.
Although this apparatus incorporates a high degree of protection against x-radiation other than the
useful beam, no practical design of equipment can provide complete protection. Nor can any
practical design compel the operator to take adequate precautions to prevent the possibility of any
persons carelessly exposing themselves or others to radiation.
It is important that anyone having anything to do with x-radiation be properly trained and fully
acquainted with the recommendations of the National Council on Radiation Protection and
Measurements as published in NCRP Reports available from NCRP Publications, 7910 Woodmont
Avenue, Room 1016, Bethesda, Maryland 20814, and of the International Commission on
Radiation Protection, and take adequate steps to protect against injury.
The equipment is sold with the understanding that the General Electric Company, GE Healthcare
Group, its agents, and representatives have no responsibility for injury or damage which may result
from improper use of the equipment.
Various protective materials and devices are available. It is urged that such materials or devices be
used.
6
Important Precautions
O
CT680 S
O
PTIMA
ERIES AND
PTIMA
CT670 I
M
NSTALLATION
ANUAL
Page 9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optima ct670Optima ct680 quantumOptima ct680 expertOptima ct680 professional

Table of Contents