GE Optima CT680 Series Installation Manual page 61

Table of Contents

Advertisement

GE C
OMPANY
D
5472001-1EN, R
IRECTION
EVISION
CAUTION
Potential for Injury.
In the ship position, the table tips easily!
DO NOT lean on the table! The shipping bracket should still be in place!
9.) Place the bubble level on the table base. Refer to
To Gantry
Figure 1-37 Level Location on the Table Base
10.) Raise or lower the table as needed using the front and rear levelers and level the table base
in the Z-direction (2 positions) and the Y-direction (1 position).
This process is complete when:
-
-
-
-
-
-
Note:
The leveling process may take several iterations of
is required to properly complete this process.
11.) When completed, turn off the laser tool.
Note:
Do not remove the table dollies.
6
Y-direction
Level Location
The cradle is still centered on the front, mid, and rear marks.
The cradle is leveled in the Z-direction at 2 positions shown in
The bubble is leveled in the Y direction.
The laser is still centered on the wall center line.
The table is still on the 26.5" line and the levelers are not resting on the flooring.
The laser is the same as in
Chapter 1 - Position Subsystems
O
CT680 S
PTIMA
ERIES AND
Figure
1-37.
Z-direction
Level Location 1
Z-direction
Level Location 2
Step
7.
Step 1
through
O
CT670 I
M
PTIMA
NSTALLATION
Figure
1-37.
Step
10. Patience and accuracy
Page 61
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optima ct670Optima ct680 quantumOptima ct680 expertOptima ct680 professional

Table of Contents