Procedure

1.) Position the gantry over the floor cutouts appropriately.
Figure 1-5 Gantry Base Installation Hardware
2.) Remove the paper templates from the floor and discard properly.
3.) Loosen the locking rings and shipping bolts so you can fine-tune the leveling pads to
4.) Position the gantry so that the adjusters are centered over their respective holes scribed earlier
IMPORTANT:
5.) Using a ½" ratchet, gently lower the gantry until it rests on the floor, over the marked areas.
Page 40
6
a.) Locate the four (4) leveling pads, and position each of them beneath its associated
adjuster.
b.) Use the dollies to evenly lower the gantry, until it is just off of the floor (approximately 3/
8" or 17.0 mm). Use a ½" ratchet to raise and lower the dollies.
c.)
Carefully rotate the gantry into the correct position over the template.
2106573
ANCHOR 1/2 X 8"
or
5487992-2
ANCHOR 1/2 X 7"
Note: Adjusters are used at each anchor location. Anchor hole ID is 1" (2.5 cm). Void between
adjuster and anchor must be filled according to local building codes for seismic application.
compensate for slight variations in the floor surface.
into the floor.
Make certain to route the gantry power cord under the two rear gantry rails, before removing
the gantry shipping dollies.
Section 5.0 - Install the Gantry
O
CT680 S
O
PTIMA
ERIES AND
PTIMA
CT670 I
M
NSTALLATION
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optima ct670Optima ct680 quantumOptima ct680 expertOptima ct680 professional

Table of Contents