GE Optima CT680 Series Installation Manual page 163

Table of Contents

Advertisement

GE C
OMPANY
D
5472001-1EN, R
IRECTION
EVISION
-
-
-
-
Note:
(16BW45.x or later)
User Logon screen will appear during system start up.
SUB-SYSTEM POWER-UP
1.) Turn ON switch S3 in the table (120VAC 24-hour power).
2.) Turn the gantry 120 - 208VAC to ON. (Light should turn on.)
3.) Turn AXIAL DRIVE ENABLE ON. (Light should turn on.)
4.) Turn HV DC ENABLE ON. (Light should turn on.)
5.) Push the Service Switch Panel reset button. (See
Figure 4-24 Service Switch Panel
AXIAL ENABLE SWITCH TEST
1.) Unplug all top cover fan plugs.
2.) Turn OFF axial drive enable switch AXIAL_DRIVE on the Service Switch Panel.
Note:
For the initial condition, do NOT leave the tube at the 2:30 position.
3.) Clear the gantry area for rotation.
6
PDU Power Switch Off
Gantry power pan breaker
All gantry service switches
Table base power
Console power (Check internal breaker.)
Chapter 4 - System Covers: Installation & Alignment
O
CT680 S
O
PTIMA
ERIES AND
PTIMA
PDU Power Switch On
Figure
4-24)
CT670 I
M
NSTALLATION
ANUAL
Page 163

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optima ct670Optima ct680 quantumOptima ct680 expertOptima ct680 professional

Table of Contents