Installing

HANDLING AND UNPACKING

This section describes the required safe handling and unpacking procedures for the
AE inverter. Always follow the recommendations in this section to prevent accidental
damage or injury.
WARNING:
Heavy equipment. AE 500 units weigh up to 4,140 kgs (9,100 lbs) with pallet
and packaging. If the unit is lifted incorrectly, it may result in death. In
addition, improper handling may result in serious damage to the unit and may
also void the warranty. Keep all doors securely closed while moving the unit.
Only use lifting equipment that is rated for the weight of the unit. Only use the
specified lifting points.
AVERTISSEMENT:
Équipement lourd. Les unités AE 500 pèsent jusqu'à 4,140 kgs (9,100 lbs)
avec palettes et emballage. Tout levage inadéquat de l'unité peut provoquer
la mort. De plus, toute manipulation inadéquate peut provoquer des
dommages graves à l'unité et pourrait aussi annuler la garantie. Garder
toutes les portes bien fermées lors du déplacement de l'unité. Utiliser
uniquement un équipement de levage d'une capacité nominale convenant au
poids de cette unité. Utiliser uniquement les points de levage spécifiés.

Packaging Contents

The following items are included with the inverter when it is packaged for shipping:
• Manual
• Warranty card
• Final test report
• Keys for door handles

Handling and Unpacking the Inverter

TOOLS REQUIRED

• Two 3/4" wrenches or one wrench and one 3/4" socket wrench
570-1001791-05A
Advanced Energy® AE 500 Inverter
Installing
Chapter
4