28. Install the transmission mount and 2 transmission
housing mounting bolts.
29. Install the starter motor and connect the starter
motor
cables.
30. Install the transmission ground cable and jumper
connector, and connect the back-up light switch,
neutral switch and speed sensor connectors.
31. Install the control box and connect the control box
connectors.
TRANSMISSION HOUSING
MOUNTING BOLTS
32. Install the air cleaner case.
33. Install the strut bar.
34. Refill the transmission with oil.
35. Connect the battery positive (+) and negative (-1
36. Inspect the rear camber (See Section 18).
37. Check the clutch operation.
38. Shift the transmission and check for smooth
12 x'1.25 m m
45 Nom (4.5 kg-m, 33 lb-h)
1 2 x 1.25mm
75 Nom (7.5 kg-m, 54 lb-ft)
cables to the battery.
operation.
CONTROL BOX
TRANSMISSION
BOLT
12 x 1.25 mm
95 Nom (9.5 kg-m, 69 lb-ft)
TRANSMISSION
BOLTS
MOUNTING
MOUNTING