1.

Configuration Workflow

This chapter describes the flow of work from the installation of the ETERNUS DX60 S5/DX100 S5/DX200 S5 in a
rack to the completion of the configuration and the flow of work from turning on the ETERNUS DX500 S5/DX600
S5/DX900 S5 to the completion of the configuration.

ETERNUS DX60 S5/DX100 S5/DX200 S5

From Rack Installation to Completion of the Initial Setup
For details about the ETERNUS Web GUI operations affixed with the (
ETERNUS video site in addition to this manual. (See the "Configuration Guide (Basic)" section in
www.fujitsu.com/global/products/computing/storage/eternus/video-library/afdx/index.html.)
When using power synchronization, perform the procedure described in
(page
58).
Attach network information labels
"LAN Connection Preparation
"Host Interface Cable Connection"
Connect the drive enclosures
"Drive Enclosure Connection"
Connect the power cord
Turn on the ETERNUS DX
: Required
: Optional
: ETERNUS Web GUI operation
ETERNUS DX
Install in a rack
"3.Rack Installation"
for Operation Management"
Connect to the host
"Power Cord Connection"
"Powering On"
"Storage Management (Initial Setup 1)"
"LAN Cable Connection(for Operation Management)"
Completion of the initial setup
Administration terminal for setup
Prepare the administration terminal for setup
"Preparing the Administration Terminal for Setup"
Connect the administration terminal for setup
Start ETERNUS Web GUI
"ETERNUS Web GUI Startup"
Perform the initial setup
Operation management terminal
Connect LAN cables
17
) icon, refer to the FUJITSU Storage
"Power Synchronized Unit Connection"
"Administration Terminal Connection"
Configuration Guide (Basic)