3. Rack Installation
Power Distribution Unit Installation
Installing Power Distribution Unit (2U)
This section describes how to install a 2U power distribution unit in a rack.
1
Attach the M5 cage nuts to the rear rack pillar.
Attachment positions
•
On either side, insert eight M5 cage nuts in the 1st, 3rd, 4th, and 6th holes above the power
distribution unit base line.
M5 cage nut
6th hole
4th hole
3rd hole
1st hole
•
Attachment procedure
Clip the M5 cage nut tabs into the desired hole from the inside.
Side view
2
Attach the cable holders to the power distribution unit.
Use eight M3 screws to attach the cable holders.
M3 screw
(Rack pillar: rear)
[Left]
1U
2U
Power distribution unit
1U
Power distribution unit
Power distribution unit
base line
M5 cage nut
Rack pillar (square hole)
Cable holder
M3 screw
M5 cage nut
[Right]
6th hole
4th hole
3rd hole
1st hole
32
Configuration Guide (Basic)