Siemens SINUMERIK 840D sl Function Manual page 361

Extended functions
Hide thumbs Also See for SINUMERIK 840D sl:
Table of Contents

Advertisement

In conjunction with the functions "program test" and "channel-by-channel running-in", the
following must be observed for an axis interchange:
● If only one of the channels is in the "program test" state, then the interchanged axis is taken
from this channel and is inserted in a channel that is not in the "program test" state. For an
interchanged axis with active axis disable, for a change via the channels with/without
channel state "program test", then the state in the axis itself does not change (see example
3).
● For a program test, for end of part program/reset, for all axes/spindles that do not
interpolate, resynchronization is made at the actual servo position. As a consequence, for
an axis interchange that is first made after the end of the program, as the axis may only
exit the channel at the end of the program, the simulated position reached is not transferred
to the accepting channel.
Note
The programs should also include a WAIT tag at the end in order that they are
simultaneously exited.
Examples
Example 1: Channel 2 is to be tested in a 3-channel system.
Test option 1: Program test without SERUPRO
1. The user decides which axes/spindles should actually be physically traversed. "Suppress
program test" is set for these axes.
2. The "program test" state is selected for channels 1 and 3.
3. Channels 1, 2 and 3 are started via the PLC.
4. "Program test" can be selected again after the end of the program.
5. If the actual setting of "suppress program test" is also practical for other situations (channel
1 or channel 3 are to be tested), then this signal can remain set. This is certainly practical
in many cases.
Test option 2: Program test with SERUPRO
1. The user decides which axes/spindles should actually be physically traversed. "Suppress
program test" is set for these axes.
2. The "program test" state is selected for channels 1 and 3.
3. Channels 1, 2 and 3 are started via the PLC.
4. A fault or an alarm occurs, the user interrupts with RESET.
5. SERUPRO at the interruption location of all 3 channels.
6. Search destination has been reached in all 3 channels.
7. Start all 3 channels.
8. Channels 1 and 3 are now again in "program test" and "channel-by-channel running-in" is
continued.
Extended Functions
Function Manual, 10/2015, 6FC5397-1BP40-5BA3
K5: Channel synchronization, axis interchange
6.1 Channel synchronization
361

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinumerik 828d

Table of Contents