Graco 25A693 Instructions Manual page 73

Intelligent paint kitchen system
Table of Contents

Advertisement

Set Up
Up Primary
Primary Tanks
Tanks
Set
Set
Up
Primary
Tanks
Each station contains one Primary Tank (G) , which
provides the fluid that is pumped throughout the
circulation system. Every Primary Tank must be
individually configured.
Use this procedure to specify the Primary Tank
installed in one specific station. If the system contains
multiple stations, use this procedure separately for
the Primary Tank in each station.
Figure 68 Primary Tank Screen
1. Press
on any Run screen to enter the Setup
menu screen.
Primary Tank
Tank.
2. Press Primary
Primary
Tank
3. On the Primary Tank screen, press the Station
Number
Number
Number field.
4. On the Station
Station Number
Station
Number keypad, enter the number
Number
of the station to be configured.
The number in the field is the station that is
being configured. The station name is displayed
directly below the Station Number.
3A4030C
NOTE: When Tank Volume is configured (see
NOTE:
NOTE:
Configure Primary Tank Volume, page
screen displays the estimated volume with the
tank level percentage. When the Tank Volume is
not configured, only the tank level percentage is
displayed.
5. Press each item's data field and use the keypad
that displays to specify the equipment used in
the selected station. For a list of fields, see
Fields on the Primary Tank Setup
NOTE: For a newly-created station, all fields read
NOTE:
NOTE:
No
No or None
No
Station
Station
6. Repeat steps 3–6 for each additional station in
the system.
Using the Setup Screens
None.
None
77), the
Screen.
73

Advertisement

Table of Contents
loading

This manual is also suitable for:

25a84325a830

Table of Contents