6)
Move the CORE FERR FFC to the
bend of the flat cable, and then
secure the CORE FERR FFC with
the two hooks on the HOLDER FFC.
7)
Engage the flat cable (P/J1001) of
the IIT ASSY SUB to the PWBA
ESS AIO.
8)
Route the HARN ASSY ADF
through the hole of the frame.
Chapter 4 Disassembly / Assembly and Adjustments
4 - 281