Figure2-4. how to install the flanges at the back panel of the switch
2.Install the switch into the cabinet
After installing the flanges on the switch, fix the flanges into the cabinet using supplied 4 screws
(as shown in Figure2-5), then plug the power cord into the switch. After turned on, the system
will first run POST, please refer to "Power on procedure" for more information.
Figure2-5.Install the switch into the cabinet