Screen: 3.8.0.0 (Power Supply) - RMG EC 900 Operating Instructions Manual

Compact gas volume corrector
Table of Contents

Advertisement

OPERATION
..........................................................................................................................................................................................................

Screen: 3.8.0.0 (power supply)

Setup power supply
<OPER. TARIFF FLOW >
NOTE! After the power supply has been changed, the device will be rebooted automatically, since
this requires a new system initialization. The parameters of the device will remain unaffected there-
by and will be retained.
72
If the test for PTZ measurements is set at 10 or 15 seconds, one counter each will be incremented
for every pressure or temperature measurement, and for every calculation of the K coefficient. The
whole test will run over a maximum of 3 minutes and start as soon as the display is off. During this
time, a total of 18 or 12 measurements and calculations have to be taken or made.
When a key is pressed, the display will be switched on and the test will be aborted. It will start
anew as soon as the display is off again. For the number of measurements taken, see under
"Checksum" (screen 6.5.0.0) in the "TYPE" book. After the 3-minute period has elapsed, the display
will switch on automatically and the test will be terminated.
This will make it possible to check and prove in the case of the battery-powered devices EC 911
and EC 921 whether the measuring cycle can be modified in "sleep mode".
..........................................................................................................................................................................................................
Sel. of standby power supply {Battery|24V|110/230V|8.2V}
"OPER." book

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents