Chrysler Sebring 2005 Service Manual page 1102

Jr
Hide thumbs Also See for Sebring 2005:
Table of Contents

Advertisement

JR
CYLINDER HEAD COVER (Continued)
Fig. 27 Spark Plug Well Seals
Fig. 28 Cylinder Head Cover Bolt Seals
(3)
Apply Mopar
camshaft cap corners and at the top edge of the 1/2
round seal (Fig. 29).
CAUTION: When installing cylinder head cover
bolts, be careful not to interchange the two (2) cen-
ter bolts with the seven (7) perimeter bolts. The two
(2) center bolts contain an aluminum washer
between the bolt head and torque limiter for sealing
purposes.
(4) Install cylinder head cover assembly to cylin-
der head. Install all bolts, ensuring the two (2) bolts
containing the sealing washer are located in the cen-
ter locations of cover. Tighten bolts in sequence
shown in (Fig. 30). Using a 3 step torque method as
follows:
(a) Tighten all bolts to 4.5 N·m (40 in. lbs.).
Engine RTV GEN II at the
Fig. 29 Sealer Locations
1 – SEALER LOCATION
(b) Tighten all bolts to 9.0 N·m (80 in. lbs.).
(c) Tighten all bolts to 12 N·m (105 in. lbs.).
Fig. 30 Cylinder Head Cover Tightening Sequence
(5) Connect PCV and make-up air hoses to cylin-
der head cover.
(6) Install ignition coil and plug wires. Tighten fas-
teners to 12 N·m (105 in. lbs.).
ENGINE 2.0L DOHC
9 - 33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sebring convertible 2005Stratus 2005

Table of Contents