Chrysler Sebring 2005 Service Manual page 1136

Jr
Hide thumbs Also See for Sebring 2005:
Table of Contents

Advertisement

JR
TIMING BELT COVER(S) (Continued)
Fig. 109 Camshaft Sprocket - Removal/Installation
1 - ADAPTER C-4687–1
2 - SPECIAL TOOL C-4687
INSTALLATION
REAR COVER
(1) Install rear cover and tighten bolts to 12 N·m
(105 in. lbs.).
(2) Install
camshaft
sprockets with Special Tools C-4687 and Adaptor
C-4687-1 (Fig. 109), tighten attaching bolts to 115
N·m (85 ft. lbs.).
(3) Install timing belt idler pulley.
(4) Install timing belt tensioner assembly (Refer to
9 - ENGINE/VALVE TIMING/TIMING BELT TEN-
SIONER & PULLEY - INSTALLATION).
sprockets.
While
holding
(5) Install timing belt (Refer to 9 - ENGINE/
VALVE TIMING/TIMING BELT AND SPROCKETS -
INSTALLATION).
(6) Install front cover.
FRONT COVER
(1) Install front cover and tighten bolts to 12 N·m
(105 in. lbs.).
(2) Install engine front engine mount bracket (Fig.
108).
(3) Install right side engine mount (Refer to 9 -
ENGINE/ENGINE MOUNTING/RIGHT MOUNT -
INSTALLATION).
(4) Remove jack from under engine.
(5) Install generator bracket and generator. Recon-
nect generator connectors.
(6) Install accessory drive belt automatic tensioner.
(7) Install the crankshaft damper (Refer to 9 -
ENGINE/ENGINE BLOCK/VIBRATION DAMPER -
INSTALLATION).
(8) Install accessory drive belts (Refer to 7 -
COOLING/ACCESSORY DRIVE/DRIVE BELTS -
INSTALLATION).
(9) Install accessory drive belt splash shield and
right front wheel.
(10) Connect negative battery cable.
ENGINE 2.0L DOHC
9 - 67

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sebring convertible 2005Stratus 2005

Table of Contents