Chrysler Sebring 2005 Service Manual page 1120

Jr
Hide thumbs Also See for Sebring 2005:
Table of Contents

Advertisement

JR
STRUCTURAL COLLAR (Continued)
Fig. 73 Structural Collar - Removal/Installation
1 - OIL PAN
2 - STRUCTURAL COLLAR
INSTALLATION
CAUTION: The torque procedure for the structural
collar must be followed, as damage to oil pan or
collar could occur.
(1) Install the structural collar (Fig. 73) using the
following 3 step torque sequence:
• Step 1: Install the collar to oil pan bolts and
tighten to 3 N·m (30 in. lbs.).
• Step 2: Install collar to transaxle bolts and
tighten to 108 N·m (80 ft. lbs.).
• Step 3: Final torque the collar to oil pan bolts to
54 N·m (40 ft. lbs.).
(2) Lower vehicle.
VIBRATION DAMPER
REMOVAL
(1) Disconnect negative battery cable.
(2) Support engine under oil pan with wooden
block and floor jack.
(3) Remove three right side engine mount vertical
bolts to front engine bracket.
(4) Raise vehicle on hoist.
(5) Remove right front wheel and belt splash
shield.
(6) Support engine under oil pan with a wooden
block and screw jack (Fig. 74).
(7) Remove front and rear engine mount through
bolts.
(8) Slowly lower engine down with screw jack.
(9) Remove accessory drive belts (Refer to 7 -
COOLING/ACCESSORY DRIVE/DRIVE BELTS -
REMOVAL).
(10) Remove crankshaft damper bolt.
(11) Remove damper using Special Tool 8454
Puller and Insert 6827–A (Fig. 75).
Fig. 74 Vibration Damper - Removal
1 - VIBRATION DAMPER
2 - WOODEN BLOCK
3 - SCREW JACK
INSTALLATION
(1) Install crankshaft vibration damper using M12
1.75 x 150 mm bolt, washer, thrust bearing and nut
from Special Tool 6792 (Fig. 76).
(2) Install crankshaft vibration damper bolt and
tighten to 136 N·m (100 ft. lbs.).
(3) Install accessory drive belts (Refer to 7 -
COOLING/ACCESSORY DRIVE/DRIVE BELTS -
INSTALLATION).
(4) Raise engine with screw jack enough to install
front and rear engine mount through bolts. Torque
fasteners to 61 N·m (45 ft. lbs.).
(5) Install belt splash shield and right front wheel.
(6) Lower vehicle.
(7) Support engine under oil pan with wooden
block and floor jack.
(8) Slowly raise engine with floor jack until engine
mount bracket aligns with right side engine mount.
Install three vertical bolts to front engine bracket.
Torque fasteners to 61 N·m (45 ft. lbs.).
ENGINE 2.0L DOHC
9 - 51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sebring convertible 2005Stratus 2005

Table of Contents