Chrysler Sebring 2005 Service Manual page 1207

Jr
Hide thumbs Also See for Sebring 2005:
Table of Contents

Advertisement

9 - 138
ENGINE 2.4L DOHC
EXHAUST MANIFOLD (Continued)
INSPECTION
(1) Inspect manifold gasket surfaces for flatness
with straight edge. Surface must be flat within 0.15
mm per 300 mm (0.006 in. per foot) of manifold
length.
(2) Inspect manifolds for cracks or distortion.
Replace manifold as necessary.
INSTALLATION
There are two different exhaust manifolds that are
used on the 2.4L engine. The PZEV manifold has a
check valve attached to it. Each manifold has a dif-
ferent torque sequence that must be followed.
(1) Install new exhaust manifold gasket. D O N OT
AP P LY S EALER.
(2) Position exhaust manifold in place. Tighten fas-
teners in sequence shown in (Fig. 108) for non-PZEV
engines to 23 N·m (200 in. lbs.). For PZEV engines
tighten bolts (Fig. 109) to 23 N·m (200 in. lbs.).
Repeat this procedure until all fasteners are at spec-
ified torque.
Fig. 108 Exhaust Manifold Tightening Sequence-
(3) Install exhaust manifold heat shield.
(4) Install check valve tighten bolts to 12 N·m (105
in. lbs.) (if equiped).
(5) Connect connector tube to check valve by push-
ing fitting over check valve.
(6) Connect oxygen sensor electrical connector.
(7) Install rear engine mount and transaxle
bracket.
(8) Install
exhaust
EXHAUST SYSTEM - INSTALLATION). Tighten fas-
teners to 28 N·m (250 in. lbs.).
(9) Lower vehicle.
(10) Connect negative battery cable.
Typical
system
(Refer
to
Fig. 109 PZEV Exhaust Manifold Tightening
TIMING BELT COVER(S)
REMOVAL
FRONT COVER - UPPER
(1) Remove upper timing belt cover fasteners (Fig.
110) and remove cover.
FRONT COVER - LOWER
(1) Disconnect negative battery cable.
(2) Raise vehicle on hoist.
(3) Remove right front wheel and belt splash
shield.
(4) Remove accessory drive belts (Refer to 7 -
COOLING/ACCESSORY DRIVE/DRIVE BELTS -
REMOVAL).
(5) Remove crankshaft damper (Refer to 9 -
ENGINE/ENGINE BLOCK/VIBRATION DAMPER -
REMOVAL).
(6) Remove AC/Generator belt tensioner.
(7) Lower vehicle.
(8) Disconnect generator connectors.
(9) Remove generator and bracket.
(10) Raise vehicle on hoist.
(11) Remove fasteners attaching lower timing
cover (Fig. 110).
(12) Remove lower timing cover.
11
-
REAR COVER
(1) Remove upper and lower front timing belt cov-
ers.
Sequence
JR

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sebring convertible 2005Stratus 2005

Table of Contents