SSANGYONG Korando 2012 Manual page 512

Hide thumbs Also See for Korando 2012:
Table of Contents

Advertisement

2. OPERATING PROCESS
System diagram
Operation
-
EEM monitors the electric loads and battery conditions and controls the voltage to improve the
fuel economy and battery charging efficiency.
-
EBS on "-" terminal of battery sends the battery information (voltage, current, temperature and
SOC) to engine ECU with LIN communication.
-
Engine ECU outputs the information from EBS and regulating control signal (PWM) according
to the engine load conditions to "L" terminal on alternator.
-
Engine ECU controls the magnetic resistance between stator coil and rotor coil by controlling
the current in rotor coil according to PWM duty value.
-
The alternating voltage induced to stator coil is converted to direct voltage by rectifier. And,
EBS outputs the charging voltage to "B" terminal on alternator.
14-17
0000-00

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents