Toyota Camry Manual page 915

Hide thumbs Also See for Camry:
Table of Contents

Advertisement

CH–14
SST (C)
SST (C)
Turn
SST (B)
Push
CHARGING (5S–FE)
(d)
(e)
P04210
(f)
(g)
SST (A)
P04395
(h)
Turn
SST (A)
P13598
4.
(a)
Inside
NOTICE:
Be careful of the rubber insulators installation direction.
S05075
(b)
S05074
GENERATOR
Mount SST (C) in a vise.
Insert SST (B) into SST (C), and attach the pulley nut to
SST (C).
To torque the pulley nut, turn SST (A) in the direction
shown in the illustration.
Torque: 110.5 N·m (1,125 kgf·cm, 81 ft·lbf)
Remove the generator from SST (C).
Turn SST (B), and remove SST (A and B).
INSTALL RECTIFIER HOLDER
Install the 4 rubber insulators on the lead wires.
Install the rectifier holder while pushing it with the 4
screws.
Torque: 2.9 N·m (30 kgf·cm, 26 in.·lbf)
Author :
Date :
1761

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents