Two Piece Stator Construction

A disassembled rotor set (8) that cannot be readily assem-
bled by hand and has a two piece stator can be assembled
by the following procedures.
1. Place stator half onto wear plate (9) with seal ring (4)
side down, after following motor assembly procedures 1
through 13. Be sure the seal ring is in place.
2. Align stator bolt holes with wear plate and
housing
bolts
and
finger tight into bolt holes approximately 180 degrees
apart to retain stator half and wear plate stationary.
3. Assemble rotor, counterbore down if applicable, into
stator half, and onto wear plate (9) with rotor splines
into mesh with drive link (10) splines.
NOTE: Use any marking you applied to rotor set components to
reassemble the components in their original relationship
to ensure ultimate wear life and performance.
4. Assemble six vanes, or as many vanes that will readily
assemble into the stator vane pockets.
EXCESSIVE FORCE USED TO PUSH THE ROTOR VANES INTO PLACE COULD
SHEAR OFF THE COATING APPLIED TO THE STATOR VANE POCKETS.
5. Grasp the output end of coupling shaft (12)
locking pliers or other appropriate turning device and
rotate coupling shaft, drive link and rotor to seat the
rotor and the assembled vanes (8C) into stator half, cre-
ating the necessary clearance to assemble the seventh
or full complement of seven vanes. Assemble the seven
vanes using minimum force.
6. Place second stator half on a fl at surface with seal ring
groove up. Apply a small amount of grease to a new seal
ring (4) and assemble it into stator half ring groove.
7. Assemble the second stator half over the two alignment
studs and rotor with seal ring side down onto the first
stator half aligning any timing marks applied for this
purpose.
3-54
turn
two
alignment
studs
with
IF THE STATOR HALF (8B) IS A DIFFERENT HEIGHT (THICKNESS) THAN STATOR
HALF (8D) THE STATOR VANES (8C) OR (8E)OF THE SAME LENGTH (HEIGHT) AS
THE STATOR HALF MUST BE REASSEMBLED IN THEIR RESPECTIVE STATOR
HALF FOR THE ROTOR SET TO FUNCTION PROPERLY.
8. Assemble six vanes, or as many vanes that will readily
assemble into the stator vane pockets.
L
9. Grasp the output end of coupling shaft (12)
with locking pliers or other appropriate turning device
and rotate coupling shaft, drive link and rotor to seat the
rotor and the assembled vanes into stator, creating the
necessary clearance to assemble the seventh or full
complement of seven vanes. Assemble the seven vanes
using minimum force.
Go to assembly procedure #15, to continue assembly.

Final Checks

1. Pressurize the motor with 100 p.s.i. dry air or nitrogen
and submerge in solvent to check for external leaks.
2. Check motor for rotation. Torque required to rotate cou-
pling shaft should not be more than 50 ft. lbs. (68 N m)
3. Pressure port with "A" cast under it on housing (18) is for
clockwise coupling shaft rotation as viewed from the
output end of coupling shaft. Pressure port with "B" cast
under it is for counterclockwise coupling shaft rotation.
4. Use test stand if available, to check operation of the
motor.
3121714