4. Cut and remove the Wire Ties holding the Harness label
to the harness. Next, remove the Wire Ties so that the
cable sleeve can be moved, exposing the conductors of
the harness.
5. Cut wire 106 going to the Engine/Generator Controller
after the existing connection point and install the con-
ductors that lead to the new inline fuse holder. Use insu-
lated butt splice connectors for these conductors.
3121714
SECTION 3 - CHASSIS & TURNTABLE
6. Re-install the harness with the new fuse in place.
7. Reconnect the lift and APU start battery. The APU is now
ready for use.