7
Installation
7.3.5
Energy chain subdivision X-modules
Chambers for EHMX-EGC-50/-80/-120/-185
1
2
3
4
5
6
1) View of open end of the energy chain
7.3.6
Installation
Note
Hoses that are permanently in contact with cables can react negatively to their material.
Install hoses separately from the cables.
Install cables and hoses separately from each other. If required, add additional separators.
Do not put motor cables together with encoder cables or plug sockets with cables in one chamber.
Install cables and hoses twist-free and without mechanical tension. Cables and hoses must be able
to move freely within the curvature radius of the energy chain.
Attach cables and hoses to the chambers of the energy chain end pieces with cable ties.
Energy chain Z-module
1. Place customer-specific cables and hoses of the mounting parts into the corresponding chambers
of the energy chain Z.
Energy chain Y-module
1. Push the slide of the Y-module up to the end stop so that the maximum possible length of the en
ergy chain Y lies flat.
2. Place cables and hoses from the energy chain Z into the energy chain Y.
108
1)
For customer-specific allocation
For customer-specific allocation
Plug socket with cable
Encoder cables and earthing cable
Motor cable (servo motor) or hoses for pneumatic drive
Motor cable (servo motor)
Festo – GDCP-YXC-EN – 1506a – English