4
Installation of the single-axis systems and the linear gantries
4.1.3
Preparation of the mounting surface
Ensure that the mounting surface is flat and vertical.
The required flatness depends on the length of the handling system.
Flatness
Y1 [mm]
3 1000
[mm]
0.1
Prepare mounting option on mounting surface. Mounting kit of the intermediate mounting is mov
able. If required, change support spacing Y2.
EHMY-LP-EGC-...-KF
Dimen
[mm]
Y1
sions
Y2
Y3
Y4
Z1
Z2
G1
Depth of thread 9
G2
EHMY-LP-EGC-...-HD
Dimen
[mm]
Y1
sions
Y2
Y3
Y4
Z1
Z2
G1
Depth of thread 9
G2
1) Hy = stroke in Y-direction (è 1.1 Technical data)
2) n = number of mounting components (è 4.1.2 Number n of mounting components)
Festo – GDCP-YXC-EN – 1506a – English
1001 ... 2000
0.2
50
1)
Hy 97
2)
Y1 / (n 1)
40
55
80
40
M4
M8
125
1)
Hy + 60
2)
Y1 / (n 1)
40
55
180
40
M6
M 8
2001 ... 3000
3001 ... 4000
0.3
0.4
80
120
Hy 16
Hy 23
125
140
M6
M 8
9
13
160
220
Hy + 94
Hy + 90
220
260
M6
M8
9
13
4001 ... 5000
0.5
185
Hy + 67
220
M8
13
33