Preparation Of The Mounting Surface - Festo YXC Series Description

Handling system
Hide thumbs Also See for YXC Series:
Table of Contents

Advertisement

4
Installation of the single-axis systems and the linear gantries
4.1.3

Preparation of the mounting surface

• Ensure that the mounting surface is flat and vertical.
The required flatness depends on the length of the handling system.
Flatness
Y1 [mm]
3 1000
[mm]
0.1
• Prepare mounting option on mounting surface. Mounting kit of the intermediate mounting is mov­
able. If required, change support spacing Y2.
EHMY-LP-EGC-...-KF
Dimen­
[mm]
Y1
sions
Y2
Y3
Y4
Z1
Z2
G1
Depth of thread  9
G2
EHMY-LP-EGC-...-HD
Dimen­
[mm]
Y1
sions
Y2
Y3
Y4
Z1
Z2
G1
Depth of thread  9
G2
1) Hy = stroke in Y-direction (è 1.1 Technical data)
2) n = number of mounting components (è 4.1.2 Number n of mounting components)
Festo – GDCP-YXC-EN – 1506a – English
1001 ... 2000
0.2
50
1)
Hy – 97
2)
Y1 / (n – 1)
40
55
80
40
M4
M8
125
1)
Hy + 60
2)
Y1 / (n – 1)
40
55
180
40
M6
M 8
2001 ... 3000
3001 ... 4000
0.3
0.4
80
120
Hy – 16
Hy – 23
125
140
M6
M 8
 9
 13
160
220
Hy + 94
Hy + 90
220
260
M6
M8
 9
 13
4001 ... 5000
0.5
185
Hy + 67
220
M8
 13
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

YxclYxcsYxcfYxcr

Table of Contents