5
Installation of the planar surface gantries and the three-dimensional gantries
6. Align second X-axis flush with the mounted X-axis.
Check:
– Length offset ± 0.4 mm × (By/1000)
7. Lightly clamp second X-axis to the mounting surface.
8. Align underside of the second X-axis parallel in height to the mounted X-axis.
Check: height offset + 0.1 mm × (By/1000)
The height offset can be adjusted only with adjusting kits. For mounting kits without ad
justment, the mounting surface must be correspondingly flat.
9. Fasten second X-axis to the mounting surface.
1
Hollow shaft
x = Hx/1000
Festo – GDCP-YXC-EN – 1506a – English
y = By/1000
1
65