Figure 32: Accessory Items - Allied Telesis AT-x550-18XTQ Installation Manual

Stackable 10gigabit intelligent access ethernet switches, alliedware plus v5.4.8-0.2
Hide thumbs Also See for AT-x550-18XTQ:
Table of Contents

Advertisement

Note
You should retain the original packaging material in case you need
to return the unit to Allied Telesis.
Figure 32 list the accessory items included with the switch. Contact your
Allied Telesis sales representative for assistance if any item is missing or
damaged.
x550 Series Installation Guide for Virtual Chassis Stacking
One 2m (6.6 ft) local management
cable with RJ-45 (8P8C) and DB-9 (D-
sub 9-pin) connectors.
One regional AC power cord
Two wall/equipment rack
brackets
Eight screws for attaching the wall/
equipment rack brackets to the
switch.
Length: 6.0mm (0.2 in.)
Diameter: 4.0mm (0.2 in.)
Two anchors for concrete walls:
Length: 29.6mm (1.2 in.)
Diameter: 6.0mm (0.2 in.)
Two screws for wood or concrete
walls:
Length: 32mm (1.3 in.)
Diameter: 4mm (0.2 in.)
Power cord retaining clip
Figure 32. Accessory Items
89

Advertisement

Table of Contents
loading

This manual is also suitable for:

X550 seriesAt-x550-18xsqAt-x550-18xspqm

Table of Contents