Figure 62: Installing The Switch On A Concrete Wall - Allied Telesis AT-x550-18XTQ Installation Manual

Stackable 10gigabit intelligent access ethernet switches, alliedware plus v5.4.8-0.2
Hide thumbs Also See for AT-x550-18XTQ:
Table of Contents

Advertisement

x550 Series Installation Guide for Virtual Chassis Stacking
Figure 62. Installing the Switch on a Concrete Wall
9. After installing all the stack switches, go to Chapter 6, "Building the
Trunk with Default Stacking Ports 17 and 21" on page 125 or Chapter
7, "Building the Trunk with Optional Stacking Ports" on page 143.
123

Advertisement

Table of Contents
loading

This manual is also suitable for:

X550 seriesAt-x550-18xsqAt-x550-18xspqm

Table of Contents